The New Construction Project of 4,000 Tons Seawater Desalination Plant in Penghu-Magong, Taiwan

◎ Models Installed:AF Series - Submersible Sewage / Wastewater Pumps

◎ Description:

Penghu County is comprises 90 small islands, total covering an area of 141 square kilometer with a population of about 100,000 which magong city area is 34 square kilometer. The average annual rainfall is around 1,000mm, which is much lower than the evaporation capacity (1,500mm), and the average altitude is around 30 meters only. The limited of water resource as the limitation of rainfall and topography, there’s no river but only the stream or creek generated by heavy rains or typhoons.
For the water demand increasing and stability of the water supply in the Penghu area, the Water Resources Agency has promoted the 「Offshore Island Water Provision Improvement Project」to build a 4,000 meters tons seawater desalination plant in Magong. This project uses the HCP PUMP AF Series Submersible Sewage / Wastewater Pumps, and provide freshwater since 2019 for the people's livelihood in Penghu.




Partial data sources:Water Resources Agency, Ministry of Economic Affairs、Google Map

© 2021 HCP PUMP MANUFACTURER CO., LTD. All rights reserved.